Office move: a checklist for the network, server, telephony, video and access

Office move: a checklist for the network, server, telephony, video and access

The office moved on Friday, and on Monday there is no internet, 1C will not open, the phones are silent and the cameras are still hanging in the old building. The reason is almost always the same: the network, the server and communications were remembered only after the renovation was finished and the furniture was in place. Below is a checklist by system: what to check and order in advance so that on Monday the office simply starts working.

The main thing: call us before the renovation starts

Cable is laid before the finishing work: afterwards it has to run over the walls in trunking, or the finished renovation has to be opened up. So the best time to survey the new office is before the renovation has begun. Then we have time to plan sockets for every workstation, a place for the cabinet and routes to the cameras and Wi-Fi access points, and you have time to order a line from the provider.

What most often breaks during a move

  • The internet is not ready. The provider did not get the line in by moving day, and the office spends a week on mobile internet.
  • The server and 1C do not come back up. After transport the server will not start or the database is unavailable, and accounting is at a standstill.
  • There is no cable network, or it is the wrong one. Too few sockets or in the wrong places, nowhere to put the cabinet.
  • Phones, cameras and access control were forgotten. The numbers do not work, cameras and readers stayed in the old office or are not configured.

Checklist by system

Internet

  • Find out which providers serve the building and order a line right after the lease is signed.
  • Agree the connection date with the provider — before moving day, so there is time to test.

Cable network

  • Survey the office and draw up a plan: how many sockets per workstation, where the printers, cameras and Wi-Fi access points go.
  • Choose a place for the cabinet: with power, no water pipes above it, and access only for your own staff.
  • Lay the cable before the finishing work and get the layout and line test reports at handover. More in the article “Structured cabling: installation mistakes”.

Server and 1C

  • Before transport, make a fresh backup and check that it restores. How to set up backups — in the article “Backups: the 3-2-1 rule”.
  • Move it at the weekend: we shut it down on Friday evening, and by Monday everything works in the new place.
  • If downtime is not acceptable, the server or its copy runs in our data center during the move, and staff connect remotely.
  • A move is a good reason not to transport the server at all, but to place it in a data center or rent one. The options are in the article “A server for 1C” and on the “Servers” page.

Telephony

  • We move and configure the IP PBX ourselves; the numbers stay with your operator.
  • We connect the phones to the new network and test every internal number before Monday.

Video surveillance

  • We take down the cameras and the recorder in the old office and install and configure them in the new one.
  • Whether the old cameras are worth moving, we decide after the survey: we look at their age and condition, and sometimes new ones make more sense.

Access control

  • If the business center already has its own access system, how to combine it with your office door is decided after the survey: it depends on the building's system.
  • We move and reconfigure the controller, readers and lock of your door, and staff keep using their existing cards.

Example: an office of 25 people

A fictional office: a server with 1C, three switches, three Wi-Fi access points, six cameras, an IP PBX and 25 phones, and its own door with access control. The new office already has a cable network, and the office moves its own equipment.

WorkSom
Server: take down, transport, install and check — at the weekend18 000
Network: router, three switches, VPN — at the weekend14 625
Wi-Fi: take down and install three access points9 900
Video: six cameras and a recorder — take down, install, configure29 400
IP PBX and 25 phones: move and configure35 800
Office door with access control: controller, two readers, lock12 900
Tax 4%4 825
Total for the move≈ 125 450

Rates are taken from our 2026 commercial proposals; weekend work uses a 1.25 coefficient. The hours for the server, network and PBX are an estimate for a typical office; we calculate the exact amount after the survey.

  • If the new office has no cable network, it has to be built: 36 connections — 25 workstations, cameras, Wi-Fi access points and printers — at ≈ 14,500 som each, about 0.5 million som including materials.
  • The server in our data center during the move — 11,500 som a month, the plan for 20–30 users.
  • Survey of the new office — paid; we quote the price after a call.